Firmware + PCB + Assembly: One Supplier, End to End Oct 6, 2026 0 24 On day 28 we walked the path from spec to board on ElectroTAS’s own line. Before that we mapped the SMD line (day 22), productivity (day 23), MOQ (day 24), yield (day 25), lead time (day 26) and choos... Argentina BOM ElectroTAS PCB design SMD assembly SME THT bootloader custom electronics development electronics assembly end-of-line test firmware functional testing production programming single supplier test points version control Read more