Firmware + PCB + Assembly: One Supplier, End to End Oct 6, 2026 0 223 On day 28 we walked the path from spec to board on ElectroTAS’s own line. Before that we mapped the SMD line (day 22), productivity (day 23), MOQ (day 24), yield (day 25), lead time (day 26) and choos... Argentina BOM ElectroTAS PCB design SMD assembly SME THT bootloader custom electronics development electronics assembly end-of-line test firmware functional testing production programming single supplier test points version control Read more
Lead Time and Hidden Costs: From Prototype to Short Series Oct 3, 2026 0 194 On day 22 we mapped the SMD pick-and-place line. On day 23 we contrasted tweezers vs machine. On day 24 we covered MOQ and lot changes. On day 25 we looked at yield, first article, and consistency. To... , universos, IP, DHCP, AUTO IP, IP estática, IP MODE, TH-2U, DMX512, Ethernet DMX, panel web, subnet, switch, ElectroTAS BOM ECO ElectroTAS NRE SMD SME Zheng Bang changeover costos ocultos dual-sourcing lead time pick and place prototipo serie corta stencil Read more